Distribution centers have spent decades engineering frontline work down to every 15 minutes of a shift. The people leading that work rarely get the same rigor. Most DC supervisors and operations managers get a title, a team, and a “good luck.”
One of us got exactly that. Before joining Connors Group, Jordan was a lean manufacturing engineer until his plant manager stopped by on a Friday and told him that on Monday he’d be running shop operations: 67 people, three shifts, in the middle of COVID.
The first weeks were firefighting. What got him through it was a simple structure for his day: when to check in with the third shift, when to build the staffing plan, when to walk the floor and coach. He didn’t have a name for it yet, but it was leader standard work.
When every improvement becomes the new standard
Leader standard work is a set of management routines: the daily, weekly, and monthly tasks we want leaders to execute consistently.
Most companies skip it and jump straight to continuous improvement. A district manager likes a process in one store and posts it to the region as the “new way.” A root cause on a DC’s Gemba board becomes one more thing a supervisor has to do today. Each fix becomes the new standard, the last one quietly drops off, and soon there is no standard at all. Multiply that across a network and you get 30 sites improving locally with no shared baseline to compare against: 30 versions of the truth.